Home
|
General Information
|
Applications
|
Advantages
|
Installations
|
Case Histories
|
Rental Program
| Well Data Sheet |
Gallery
|
Contact
| Spanish
©2010 Permian Production Equipment, Inc. All Rights Reserved.
COMPANY INFORMATION
COMPANY
ADDRESS
PHONE
CITY
FAX#
STATE
ZIP
PROJECT MANAGER
PHONE#
EMAIL ADDRESS
CELL#
WELL INFORMATION
Well Name
Location (city,state and country)
GPS Data- Longitude
Latitude
Production Data- Oil (bpd)
Gas Sales MCFD
Water
Fuel Gas
Total Fluid
Heater Gas
Present Casing Pressure (PSIG) at wellhead
Total Gas -(MCFD)
Desired Casing Pressure (PSIG) at wellhead
Is Well Chemically Treated if so for what
Present Discharge (Flowline) Pressure (PSIG)
Gas (Sweet/Sour)
Sweet
Sour
High Discharge Pressure (PSIG)
Perforation Depth
Pump Depth
Pump Size
Producing Formation
Pump Efficiency %
Tubing Pressure
Producing Bottom Hole Pressure
Static Bottom Hole Pressure
PUMPING UNIT INFORMATION
Make
Time Cycle (% of 24 Hours)
Model Size
Polished Rod Stroke Length
Long/Medium/Short
Strokes Per Minute)
Prime Mover HP
Gas or Electric
Style (Circle)
Conventional
Mark
Air Balance
Curved Walking Beam